<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Articles | Ε.Σ.Σ.Α.Η.Ε</title>
	<atom:link href="https://haess.gr/en/category/articles/feed/" rel="self" type="application/rss+xml" />
	<link>https://haess.gr/en/category/articles/</link>
	<description>Ελληνικός Σύνδεσμος Συστημάτων Αποθήκευσης Ηλεκτρικής Ενέργειας</description>
	<lastBuildDate>Mon, 23 Nov 2026 15:01:35 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://haess.gr/wp-content/uploads/2026/11/haess-company-essahe-pin-150x150.png</url>
	<title>Articles | Ε.Σ.Σ.Α.Η.Ε</title>
	<link>https://haess.gr/en/category/articles/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Electricity storage at the heart of the energy transition</title>
		<link>https://haess.gr/en/electricity-storage-the-heart-of-the-energy-transition/</link>
		
		<dc:creator><![CDATA[Ε.Σ.Σ.Α.Η.Ε]]></dc:creator>
		<pubDate>Thu, 05 Jun 2025 08:00:00 +0000</pubDate>
				<category><![CDATA[Articles]]></category>
		<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://haess.gr/?p=549</guid>

					<description><![CDATA[<p>The transition to a greener, more sustainable future is one of Greece’s most important energy policy goals. It will give the country the resilience it needs as crises become more frequent and help it compete internationally as conditions change. Greece must therefore make the most of its own energy resources, including renewables such as solar [&#8230;]</p>
<p>Το άρθρο <a href="https://haess.gr/en/electricity-storage-the-heart-of-the-energy-transition/">Electricity storage at the heart of the energy transition</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The transition to a greener, more sustainable future is one of Greece’s most important energy policy goals. It will give the country the resilience it needs as crises become more frequent and help it compete internationally as conditions change.</p>



<p class="wp-block-paragraph">Greece must therefore make the most of its own energy resources, including renewables such as solar and wind. One encouraging sign is that in 2024 renewables, including large hydropower plants, accounted for 56% of the country’s electricity generation.</p>



<p class="wp-block-paragraph">As more electricity comes from renewables such as solar and wind farms, the national power system faces new demands. One of the most pressing is how to manage fluctuations in their output and the uncertainty over how much electricity they will produce.</p>



<p class="wp-block-paragraph">Electricity storage has a particular role here. It is the principal means of stabilising a power system that relies on intermittent sources.</p>



<p class="wp-block-paragraph">In 2024, Greece’s installed renewable generating capacity reached 13 GW. A further 16 GW of projects had secured grid connection offers and were awaiting connection. Applications still pending represented more than 40 GW, bringing the total to nearly 70 GW even before counting future projects still at the planning stage.</p>



<p class="wp-block-paragraph">Renewable generation already exceeds demand at certain times of day when consumption is low. This makes it harder to balance the system and can push electricity prices to zero or below. It also opens up opportunities for electricity storage systems to stabilise the grid and make fuller use of renewables, helping Greece move towards greener energy while maintaining the security and economic viability of its electricity supply.</p>



<p class="wp-block-paragraph">Electricity storage systems that can trade in the electricity markets therefore need to be built as soon as possible. They can smooth price swings over the course of the day, a particularly pressing issue, and help bring down the cost that consumers ultimately pay for electricity. Pairing storage with renewables will also allow us to manage the electricity generated more effectively, increase the share of renewables and keep the energy transition on a secure footing.</p>



<p class="wp-block-paragraph">The updated National Energy and Climate Plan (NECP) identifies adequate storage power and energy capacity as essential. By 2030 it envisages 4.3 GW of battery storage and 1.7 GW of pumped storage, a total of 6 GW.</p>



<p class="wp-block-paragraph">The licensing register of the Regulatory Authority for Waste, Energy and Water (RAAEY) shows that licensed electricity storage systems and hybrid projects combining renewables with storage already far exceed the NECP projections. Battery storage licences cover more than 40 GW of power and over 100 GWh of energy capacity. Pumped storage licences account for 5.26 GW and 50 GWh respectively. Licences for ‘special projects’ combining renewables and storage under Article 10(11B) of Law 4685/2020 add a further 6 GW of renewable generating capacity and 14 GWh of storage.</p>



<p class="wp-block-paragraph">Including licensed renewable projects in category 11A and hybrid projects on the islands brings the total to nearly 70 GW of storage power and 200 GWh of energy capacity. These figures show the strength of investor interest in electricity storage, encouraged by the sharp fall in the cost of lithium batteries and other storage technologies.</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="1024" height="486" src="https://haess.gr/wp-content/uploads/2025/06/Electricity-storage-at-the-heart-of-the-energy-transition-1024x486.png" alt="" class="wp-image-678" style="aspect-ratio:2.1070784667241513" srcset="https://haess.gr/wp-content/uploads/2025/06/Electricity-storage-at-the-heart-of-the-energy-transition-1024x486.png 1024w, https://haess.gr/wp-content/uploads/2025/06/Electricity-storage-at-the-heart-of-the-energy-transition-767x364.png 767w, https://haess.gr/wp-content/uploads/2025/06/Electricity-storage-at-the-heart-of-the-energy-transition-300x142.png 300w, https://haess.gr/wp-content/uploads/2025/06/Electricity-storage-at-the-heart-of-the-energy-transition.png 1265w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<p class="wp-block-paragraph"><strong>The legal and regulatory framework</strong></p>



<p class="wp-block-paragraph">Until recently, uncertainty about the Greek regulatory framework for storage deterred investment. Since 2022, however, considerable work has gone into clarifying the rules, and storage is now recognised as having a distinct role in the energy mix.</p>



<p class="wp-block-paragraph">Two years ago, in response to the shortage of electricity storage systems, the government scheduled three tenders to support the rapid installation of 1 GW of storage. The first two concluded in 2023 and the third only in early 2025. In response to strong investor interest, the Ministry of Environment and Energy also plans to auction 3.55 GW of grid connection capacity this year for stand-alone merchant battery systems. These projects would receive priority for grid connection offers, without state aid. Under the draft ministerial decision put out to public consultation in late February, 2.65 GW would be available for projects connecting to the Independent Power Transmission Operator’s grid and 900 MW for those connecting to the Hellenic Electricity Distribution Network Operator’s grid. Together with the 900 MW already allocated through the completed tenders, the planned call is intended to meet the NECP’s 2030 target of 4.3 GW of battery storage as soon as possible.</p>



<p class="wp-block-paragraph">At present, the only electricity storage systems operating in the Greek market are the older hydropower plants with pumping capability, with a combined installed capacity of around 700 MW. The latest information also suggests that the first new storage projects will enter service in the first half of 2026, later than originally expected in 2025. Meanwhile, rising curtailment of renewable generation and the appearance of zero prices in the day-ahead market suggest that the country’s power system has reached its limits. Both trends pose serious challenges for the immediate future.</p>



<p class="wp-block-paragraph"><strong><strong>Conclusion </strong></strong></p>



<p class="wp-block-paragraph">Considerable work has gone into regulatory reform and the introduction of clear operating rules for storage systems. Several issues still need to be resolved before the framework is complete.</p>



<p class="wp-block-paragraph">Electricity storage is a cornerstone of the energy transition in Greece and internationally. With the right combination of technology, political will and funding, Greece can become a leader in green energy in south-eastern Europe. The stakes are high, and the momentum is encouraging.</p>
<p>Το άρθρο <a href="https://haess.gr/en/electricity-storage-the-heart-of-the-energy-transition/">Electricity storage at the heart of the energy transition</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Why do we need electricity storage?</title>
		<link>https://haess.gr/en/why-do-we-need-electricity-storage/</link>
		
		<dc:creator><![CDATA[Ε.Σ.Σ.Α.Η.Ε]]></dc:creator>
		<pubDate>Tue, 25 Feb 2025 16:23:00 +0000</pubDate>
				<category><![CDATA[Articles]]></category>
		<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://haess.gr/?p=558</guid>

					<description><![CDATA[<p>Greece is expanding renewable generation and adapting its infrastructure under the Paris Agreement, the EU’s Green Deal and Fit for 55 package, and its own National Energy and Climate Plan (NECP) and Climate Law. It aims to make renewables the mainstay of its energy mix, reduce its dependence on fossil fuels by 2030 and end [&#8230;]</p>
<p>Το άρθρο <a href="https://haess.gr/en/why-do-we-need-electricity-storage/">Why do we need electricity storage?</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Greece is expanding renewable generation and adapting its infrastructure under the Paris Agreement, the EU’s Green Deal and Fit for 55 package, and its own National Energy and Climate Plan (NECP) and Climate Law. It aims to make renewables the mainstay of its energy mix, reduce its dependence on fossil fuels by 2030 and end it by 2050.</p>



<p class="wp-block-paragraph">The rapid growth of renewables also brings new technical requirements and poses technical and economic problems that need to be resolved promptly. Under present conditions, it is vital to develop systems that can store electricity generated from renewable sources and to give them a clear, reliable regulatory framework in which to operate.</p>



<p class="wp-block-paragraph">Why is it so urgent to integrate energy storage? The number of renewable energy projects operating or under development in Greece has become practically unmanageable. Around 13 GW of renewable capacity is already operating, and another 16 GW of projects with grid connection offers is waiting to come online. Applications from new renewable projects awaiting connection terms account for more than 40 GW. That takes the total to 69 GW, even before any projects that may be developed from now on are counted.</p>



<p class="wp-block-paragraph">The surplus of renewable electricity expected at particular times of day, together with the variability of renewable generation, poses major technical challenges for grid capacity and power balancing, as well as economic challenges when marginal electricity prices fall to zero. It also creates an opportunity to make storage central to balancing the system and to use it to support a transition to a greener energy mix that is both economically feasible and technically secure.</p>



<p class="wp-block-paragraph">The updated NECP, published for consultation on 22 August, identifies storage with sufficient power and energy capacity as a prerequisite for integrating more renewables into the country’s energy mix. Electricity storage plants will be able to displace conventional generation at peak times by storing electricity mainly around midday, when renewable output is high. Some of that electricity is already being curtailed, and the amount is set to grow exponentially.</p>



<p class="wp-block-paragraph">Stand-alone storage systems will participate in the electricity markets, helping to smooth price swings over the course of the day, a pressing problem at present, and to bring down the prices that consumers ultimately pay.</p>



<p class="wp-block-paragraph">Storage systems using batteries can also be paired with renewables. They allow a hybrid plant to make the best use of the electricity it generates and can help to lower electricity prices.</p>



<p class="wp-block-paragraph">The updated NECP ultimately envisages 4.3 GW of battery storage and 1.7 GW of pumped storage by 2030, giving a combined power capacity of 6 GW.</p>



<p class="wp-block-paragraph">The electricity storage systems and hybrid renewable projects with storage in the licensing register of the Regulatory Authority for Waste, Energy and Water (RAAEY) already represent several times the capacity envisaged in the NECP. Licences issued for battery storage cover more than 40 GW of power and over 100 GWh of energy storage capacity. Pumped storage licences account for 5.26 GW and 50 GWh. Licences for ‘special projects’, which combine storage with renewables under Article 10(11B) of Law 4685/2020, account for almost 6 GW of renewable generating capacity and 14 GWh of storage.</p>



<p class="wp-block-paragraph">Including licensed category 11A renewable projects and licensed hybrid projects on the islands brings total storage power to an impressive 68 GW (Figure 1) and energy capacity to 193 GWh (Figure 2). These figures confirm the strength of the interest seen over many years.</p>



<figure class="wp-block-image size-full"><img decoding="async" width="1403" height="565" src="https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.1.png" alt="" class="wp-image-715" srcset="https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.1.png 1403w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.1-767x309.png 767w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.1-300x121.png 300w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.1-1024x412.png 1024w" sizes="(max-width: 1403px) 100vw, 1403px" /><figcaption class="wp-element-caption">Figure 1</figcaption></figure>



<figure class="wp-block-image size-full"><img decoding="async" width="1403" height="565" src="https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.2.png" alt="" class="wp-image-716" srcset="https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.2.png 1403w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.2-300x121.png 300w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.2-767x309.png 767w, https://haess.gr/wp-content/uploads/2025/02/Why-do-we-need-electricity-storage.2-1024x412.png 1024w" sizes="(max-width: 1403px) 100vw, 1403px" /><figcaption class="wp-element-caption">Figure 2</figcaption></figure>



<p class="wp-block-paragraph">Yet the only storage plants operating in the domestic market today are the older hydroelectric plants with pumping capability, with a total installed capacity of around 700 MW. The Greek electricity system appears to have reached its limits. Increasing curtailment of renewable generation and zero or even negative wholesale prices in the day-ahead market are evidence of the difficulties this presents.</p>



<p class="wp-block-paragraph">The government should move Greece as quickly as possible towards the energy transition and genuine energy independence. One important milestone for electricity storage in Greece was the support scheme for stand-alone battery systems. Under Law 4951/2022, the Greek government set in motion three auctions to support large-scale batteries with a combined capacity of 1 GW. The third and final auction is still pending. It covers 300 MW with a minimum duration of four hours, equivalent to 1,200 MWh of storage capacity.</p>



<p class="wp-block-paragraph">Complex technical, economic, social and political decisions still have to be made under considerable time pressure. The following steps are needed.</p>



<ul class="wp-block-list">
<li>Complete the regulatory framework as a matter of urgency, setting out how storage plants can participate in the relevant markets, particularly the balancing market, and what rules govern their participation. The last public discussion of market rules for electricity storage systems took place during the Independent Power Transmission Operator’s (IPTO) public consultation in April 2023. Since then, two auctions have awarded operating and investment aid to plants totalling 700 MW, yet the rules have progressed no further. With the first storage plants expected to enter operation in 2025, the main details of market participation must be settled as soon as possible through meaningful consultation with market participants.</li>



<li>Finalise and publish the methodology for annual support for electricity storage systems. It should clarify how and when compensation is settled, how long the regulatory period lasts and how projects are grouped, and resolve the other outstanding questions.</li>



<li>Remove the provision for imposing static operating restrictions on storage plants. The technology is inherently capable of responding dynamically and with considerable flexibility in the electricity markets.</li>



<li>Launch the third and final auction for storage plants with a four-hour storage requirement. Although the Greek electricity market has changed rapidly over the past three to four years, its storage market is still in its infancy. This makes regulatory certainty particularly important for investment support schemes that have already been approved and set in motion. Completing the current scheme must in no way prevent or delay the issue of connection terms to plants that wish to participate freely in the relevant markets. Renewable generators already have both options: they can participate in a support scheme or enter the market without aid.</li>



<li>Begin introducing a mechanism to remunerate available capacity as soon as possible and establish the competitive procedures it will require.</li>



<li>As part of its efforts to promote storage for system balancing, the government should also support storage facilities that can draw electricity from and inject it into the grid and that are paired with renewable generators, under Article 10(11B) of Law 4685/2020.</li>
</ul>



<p class="wp-block-paragraph">Greece is right to meet as much of its energy demand as possible from renewables. It aims to reduce its environmental footprint substantially and make its energy sector more competitive. Electricity storage systems can and should play a decisive role by enabling the country to integrate renewables safely and efficiently and build a resilient, sustainable energy future. We cannot afford to lose any more time.</p>
<p>Το άρθρο <a href="https://haess.gr/en/why-do-we-need-electricity-storage/">Why do we need electricity storage?</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The energy transition needs every ‘green’ megawatt-hour</title>
		<link>https://haess.gr/en/the-energy-transition-needs-evert-green-megawatt-hour/</link>
		
		<dc:creator><![CDATA[Ε.Σ.Σ.Α.Η.Ε]]></dc:creator>
		<pubDate>Tue, 25 Feb 2025 14:15:00 +0000</pubDate>
				<category><![CDATA[Articles]]></category>
		<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://haess.gr/?p=574</guid>

					<description><![CDATA[<p>Storing energy is no new idea. It has been part of the development of human civilisation throughout history. In its modern forms, energy storage is also essential to the energy transition. This explains the strong and sustained commitment, in Europe and internationally, to supporting large-scale energy storage technologies. That commitment was bound to have an [&#8230;]</p>
<p>Το άρθρο <a href="https://haess.gr/en/the-energy-transition-needs-evert-green-megawatt-hour/">The energy transition needs every ‘green’ megawatt-hour</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Storing energy is no new idea. It has been part of the development of human civilisation throughout history. In its modern forms, energy storage is also essential to the energy transition. This explains the strong and sustained commitment, in Europe and internationally, to supporting large-scale energy storage technologies.</p>



<p class="wp-block-paragraph">That commitment was bound to have an impact on the Greek market, bringing modern storage technologies to the fore. In Greece, investment interest is several times greater than even the targets in the National Energy and Climate Plan (NECP) now under revision. By the end of 2022, storage licences had been issued for more than 25 GW, while the revised NECP target envisages 8.1 GW of capacity by 2030.</p>



<p class="wp-block-paragraph">The members of the Hellenic Association of Energy Storage Systems (HAESS) recognised early on what storage could contribute to the energy transition and to security of supply. They have included electricity storage projects in their development portfolios since 2020. These projects cover a range of technologies, including stand-alone storage facilities, hybrid plants and storage combined with renewable generation, both with and without the ability to charge from the grid. Our members also account for a substantial share of investment interest in Greece, with more than 9 GW of guaranteed capacity in storage projects at various stages of licensing.</p>



<p class="wp-block-paragraph">This investment interest goes beyond the ambitious national targets and reflects a long-term commitment. Investors with renewable energy portfolios recognise that storage will allow them to make the most of those assets. It can make their portfolios more attractive for bilateral contracts, more financially viable when participating directly in wholesale markets, or both.</p>



<p class="wp-block-paragraph">Investors and system operators have seen, particularly over the past five months, that curtailment of renewable electricity fed into the grid has become a regular occurrence. Only by installing and operating storage facilities can we address this problem. As more renewable generation comes online, system stability will increasingly be at risk unless storage enters service at a corresponding pace, particularly when demand is low. Greece saw this over the weekend of 25 and 26 March, when the system reached its limits and renewable generators received repeated curtailment instructions.</p>



<p class="wp-block-paragraph">In these circumstances, it matters that Greece laid the foundations for its storage legislation as early as July 2022 with Law 4951. More recently, the government put out for public consultation the ministerial decision that will allow storage tenders to go ahead. Several steps still have to be taken before the first storage facilities can join the Greek power system.</p>



<p class="wp-block-paragraph"><strong>Access to the transmission system and distribution network</strong>. Storage facilities need final connection offers. According to the Independent Power Transmission Operator (IPTO), applications for such offers have been submitted to date for projects totalling 5.3 GW. Yet the forthcoming tender will take place before investors know how their projects will connect to the grid.</p>



<p class="wp-block-paragraph"><strong>Operating restrictions</strong>. The ministerial decision is still pending. For storage facilities in particular, it should provide for dynamic restrictions only. Storage already helps make the best use of the transmission system and distribution network. Applying static restrictions to all storage facilities in advance would run counter to the very reason for introducing them into the energy market.</p>



<p class="wp-block-paragraph"><strong>Completion of the regulatory framework.</strong> Work on amending the relevant regulations and codes must be accelerated so that the participation rules can be settled and communicated to market participants as soon as possible.</p>



<p class="wp-block-paragraph"><strong>Support for storage on the non-interconnected islands and Crete.</strong> The legal framework, which has been pending since 2016, must be completed.</p>



<p class="wp-block-paragraph">The government needs to move quickly to develop renewable generation and electricity storage in parallel. That would limit future curtailment of the kind that has become so acute in recent months. It would also prevent curtailment from being presented as the way to give new renewable generators access to the grid. Renewable electricity should never have to be curtailed because the system lacks the right storage technologies. The energy transition needs every ‘green’ megawatt-hour.</p>



<p class="wp-block-paragraph">Electricity storage can and will play the leading role in Greece’s energy transition. That is one of the reasons HAESS was founded and remains central to its work.</p>
<p>Το άρθρο <a href="https://haess.gr/en/the-energy-transition-needs-evert-green-megawatt-hour/">The energy transition needs every ‘green’ megawatt-hour</a> εμφανίστηκε πρώτα στο <a href="https://haess.gr/en/">Ε.Σ.Σ.Α.Η.Ε</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
